LJ-15W Water Chiller System
Product parameter
- Power:22kW
- Cooling power(AT-20℃):30kW
- Circulating pump:15m³/h
- Pressure:2.5bar
All products support customized services
Phone: +86-18806176058
Search Search all
All products support customized services
Detailed Description
LNEYA specializes in the production of single-fluid cryogenic chillers. The refrigeration temperature ranges from -150°C to -5°C, which can meet the needs of different refrigeration temperatures. Products are widely used in chemical, pharmaceutical, biochemical and other industries in the field of low temperature reaction, refrigeration speed, safety and reliability. The company developed a direct-cooled ultra-low temperature chiller, using international brand compressors Carrier, using automatic cascade refrigeration mode and mixed refrigerants, within 3 minutes can be refrigerated to minus 120°C.
Model | LJ-6W | LJ-10W | LJ-15W | LJ-20W | LJ-30W | LJ-40W | LJ-60W | LJ-90W | LJ-120W | LJ-180W |
Temperature Range | -45°C~ -10°C (optional: -150°C ~ -5°C) | |||||||||
Cooling Capacity At -35°C | 6kw | 10kw | 15kw | 20kw | 30kw | 40kw | 60kw | 90kw | 120kw | 180kw |
5160Kcal/h | 8600Kcal/h | 12900Kcal/h | 17200Kcal/h | 25800Kcal/h | 344000Kcal/h | 51600Kcal/h | 77400Kcal/h | 103200Kcal/h | 154800Kcal/h | |
Circulation Pump Info | 6.6m³/h | 9m³/h | 15m³/h | 15m³/h | 25m³/h | 25m³/h | / | / | / | / |
2.5bar | 2.5bar | 2.5bar | 2.5bar | 2.5bar | 2.5bar | / | / | / | / | |
Inlet&outlet connection size | DN-25 PN-10 | DN-32 PN-10 | DN-40 PN-10 | DN-40 PN-10 | DN-50 PN-10 | DN-50 PN-10 | DN-50 PN-10 | DN-65 PN-10 | DN-65 PN-10 | DN-80 PN-10 |
Cooling Water at 30°C | 8m³/h | 10m³/h | 16m³/h | 20m³/h | 25m³/h | 30m³/h | 38m³/h | 55m³/h | 70m³/h | 100m³/h |
Expansion tank(standard) | 50L | 80L | 150L | 180L | 200L | 250L | 400L | / | / | / |
Compressor | Emerson Copeland、Dorin semi-closed compressor、Carlyle | Carlyle、HANBELL、Fusheng、Bitzer screw compressor | ||||||||
Evaporator | plate heat exchanger | |||||||||
Refrigerant | R404A | |||||||||
Secondary refrigerant | No corrosive liquid, ethanol water, heat transfer oil etc. | |||||||||
Safety Protection | High pressure protect; water supply cut-off protection; over-current protection; leakage protection; sequential and phase failure protection; High temperature protection; Sensor Failure protection; Liquid low level protection etc. multi-safety protection | |||||||||
Level Indicator | Adopt glass liquid level indication | |||||||||
Piping material | Expansion tank, cold storage tank and circulation pipeline are all made of SUS304 | |||||||||
Case material | Channel steel + square tube + cold rolled plate sealing plate spray 7035 | |||||||||
Dimension cm | 100*150*185 | 100*150*185 | 200*145*205 | 200*145*205 | 250*145*225 | 250*145*225 | 300*160*225 | 350*160*245 | 400*160*245 | 500*200*260 |
Power | 14kW | 17kW | 25kW | 34kW | 52kW | 65kW | 100kW | 127kW | 167kW | 270kW |
dB | within 75dB | within 80 dB | within 90 dB | |||||||
Weight (kg) | 800 | 950 | 1100 | 1350 | 1500 | 1800 | 2400 | 3100 | 3600 | 5000 |
Optional | Optional outside touch screen display controller (separated), the communication line distance is 10 meter | |||||||||
Optional | Optional explosion-proof touch screen control system (ExdeIIBT4), the communication line distance is 15 meter |
LNEYA attends various exhibitions at home and abroad every year. At the exhibition, we show the latest research equipment of LNEYA. Every year, long-term cooperative customers will come to exhibitions and communicate with us. We are also actively developing new customers to provide them with high quality machines and services.
Guarantee that the goods are sold to be conform to the provisions of the contract and qualified new products by factory inspection, quality performance, technical indicators and configured are in accordance with manufactures and technical documents stipulated in the contract.
After the arrival of the goods, my company or my company agent is responsible for installation and debugging of equipment need on-site installation and debugging.
After installation and debugging, acceptance by the customer to confirm the goods to be conform to the provisions of the contract and qualified new products, quality performance, technical indicators and configured are in accordance with manufactures and technical documents stipulated in the contract, and after the confirmation of a full set of technical documents, sign the installation acceptance report and confirm acceptance.
At the same time of installation and debugging of equipment, my company’s after-sales service engineer is responsible for technical training for user until user can be skilled of operation. In the process of using equipment by customer, customer can consult relevant technical issues to after-sales service personal of our company at any time, according to the situation, my company will arrange training on site or remote.
A full free one year warranty since the date of acceptance, during the warranty period, all repairs and spare parts are free of charge(instrukent malfunction caused bu human factors will be charged of cost price of spare parts); After the warranty period, we will be responsible for maintenance of equipment for lifetime, according to the actual maintenance fees, appropriate fee will be charged.
(PS:There will have extra charge if the customer need on-site service. And customers need to describe the issue first and then send some failed pics or videos in advance, then Lneya judge if it is possible to go for after-Sales on site. )