Search Search all

FL-800N Laboratory Small Water Chiller

Product parameter

  • Power:0.6kW
  • Cooling power(AT 20℃):0.9kW
  • Flow:10L/min
  • Pressure:0.6bar

All products support customized services

 

Request a Quote       Email Us        More Product Models

Small water chiller is designed for small laboratories, the mini chiller FL-800N has a small footprint that saves lab space and can be placed directly on a bench or on the floor. Widely used in low temperature conditions requiring chemical, biological and physical experiments at low temperatures. It can be combined with the rotary evaporator, glass reactor and other instruments to proceed kinds of chemical reactions.

Product Description

1) Compact design, small size and light weight, small footprint.

2) Air-cooled design.

3) Large LCD screen, button operation.

4) The fully enclosed circulation system can effectively prevent the evaporation and pollution of the heat transfer medium and save resources.

 

Note: please leave your detailed requirements, we will select or customize products for you.

Message                  Email                      WhatsApp

 

ModelFL-800N
Medium Temperature Range-18°C~30°C
Temp. ControlASET multifunctional controller, control temperature of water tank, Customizable temperature control accuracy ±0.5℃
Tem. FeedbackTemperature feedback PT100
Cooling Capacity20℃0.9kW
10℃0.76kW
-10℃0.35kW
Circulation pump flow, pressure10L/min 0.7BAR
Capacity of liquid storage3.5L
CompressorEmbrac
EvaporatorCopper tube nickel plating
Operation panelDisplay set temperature and measured temperature, touch key to operate input temperature
Safety ProtectionSelf-diagnosis function; freezer overload protection; high pressure switch;overload relay, thermal protection device etc. security protection function.
RefrigerantR404A (Optional R448)
Connection SizeG1/2
Product size(mm)415*225*497
Weight35kg
Power (max)
50HZ
AC220V 0.95KW
Shell MaterialCold rolled steel painting

About Us

Detailed parameters

Max Working Temp.

30℃

Min Working Temp.

-18℃

Power

0~5kW

Temp. control mode

Thermal Oil Temp. Control

Temp. Accuracies

None

LNEYA attends various exhibitions at home and abroad every year. At the exhibition, we show the latest research equipment of LNEYA. Every year, long-term cooperative customers will come to exhibitions and communicate with us. We are also actively developing new customers to provide them with high quality machines and services.

After sale service

Quality assurance

Guarantee that the goods are sold to be conform to the provisions of the contract and qualified new products by factory inspection, quality performance, technical indicators and configured are in accordance with manufactures and technical documents stipulated in the contract.

Installation and debugging

After the arrival of the goods, my company or my company agent is responsible for installation and debugging of equipment need on-site installation and debugging.

Inspection and acceptance

After installation and debugging, acceptance by the customer to confirm the goods to be conform to the provisions of the contract and qualified new products, quality performance, technical indicators and configured are in accordance with manufactures and technical documents stipulated in the contract, and after the confirmation of a full set of technical documents, sign the installation acceptance report and confirm acceptance.

Training

At the same time of installation and debugging of equipment, my company’s after-sales service engineer is responsible for technical training for user until user can be skilled of operation. In the process of using equipment by customer, customer can consult relevant technical issues to after-sales service personal of our company at any time, according to the situation, my company will arrange training on site or remote.

After sale service commitment

A full free one year warranty since the date of acceptance, during the warranty period, all repairs and spare parts are free of charge(instrukent malfunction caused bu human factors will be charged of cost price of spare parts); After the warranty period, we will be responsible for maintenance of equipment for lifetime, according to the actual maintenance fees, appropriate fee will be charged.

(PS:There will have extra charge if the customer need on-site service. And customers need to describe the issue first and then send some failed pics or videos in advance, then Lneya judge if it is possible to go for after-Sales on site. )

Get Free Quote Plan

loading...

购物车

X

我的足迹

X
keywords:< a href="https://lneya-online.com/sitemap.html" title="water chiller"target="_blank">Bottled joy < a href="https://lneya-online.com/sitemap.xml" title="water chiller"target="_blank">water chiller