Search Search all

TES-85A15W Chiller for Semiconductor

Product parameter

  • Power:37kW
  • Heating power:15kW
  • Flow:110L/min
  • Pressure:2.5bar
  • Temperature control accuracy:±0.3℃

Request a Quote

LNEYA represents the international advanced liquid temperature control technology, actively explores and studies component testing systems, mainly used for temperature test simulation in semiconductor testing, with wide temperature orientation and high temperature rise and fall, temperature range -92°C ~ 250°C, suitable for various Test Requirements. LNEYA is committed to solving the problem of temperature control lag in electronic components. Ultra high temperature cooling technology can be cooled directly from 300°C.

Product Application

This product is suitable for precise temperature control of electronic components. In the manufacture of semiconductor electronic components for harsh environments, the IC packaging assembly and engineering and production testing phases include electronic thermal testing and other environmental testing simulations at temperatures (-45°C to +250°C). Once put into practical use, these semiconductor devices and electronic products can be exposed to extreme environmental conditions to meet demanding military and telecommunications reliability standards.

Product parameters (All products can be customized)

ModelTES-85A15W
Temp. Range-85℃~200℃
Heating Power15kW
Refrigerating Output200℃15kW
100℃15kW
20℃15kW
0℃15kW
-40℃11kW
-60℃6.5kW
-80℃2.5kW
Temp. Control Accuracy of Heat Conduction Medium±0.3℃
System Pressure DisplayPressure of Refrigeration system is realized by pressure gauge (High pressure, low pressure);
Pressure of circulatory system is detected by pressure sensor and displayed on touch screen.
ControllerSiemens PLC, Fuzzy PID Control algorithm with Cascade Control algorithm.
Temp. ControlTemperature Control Mode for outlet of Heat conduction medium;
External temperature sensor: (PT100 or 4~20mA or communication given) control mode (cascade control)
Programmable10 procedures can be developed, and each program can be composed of 40 steps
Communicating ProtocolEthernet Interface TCP/IP Protocol
Internal Temperature FeedbackOutlet temperature, inlet temperature, condensing temperature, ambient temperature, suction temperature of compressor, cooling water temperature (water cooling equipment configuration) of equipment heat conduction medium outlet temperature, medium inlet temperature, refrigeration system condensation temperature, ambient temperature, compressor suction temperature, cooling water temperature.
External Access Temp FeedbackPT100 or 4~20mA or communication given.
Cascade control timeThe temperature difference between the outlet temperature and the external temperature sensor can be set and controlled;
Temp. difference control functionThe temperature difference between the inlet temperature and the outlet temperature of the equipment can be set to be controlled (to protect the safety of the system).
Closed-cycle systemThe whole system is a completely closed system with no oil mist at high temperature and no water in the air at low temperature. The system will not increase the pressure due to high temperature and automatically replenish the heat conduction medium at low temperature.
HeatThe maximum heating output power of the system (According to each model);
The heater has triple protection and independent temperature limiter to ensure the safety of heating system;
The power is more than 10kW and the voltage regulator is adopted, and the heating power output control is controlled by 4-20mA linear control.
Refrigerating CapacityRefers to the ability to take away heat at different temperatures (ideal condition), the actual working conditions need to consider environmental heat dissipation, please enlarge properly, and do a good job of insulation measures.
Circulating pump flow (max)Adopt crown submagnetic drive pump / German brand magnetic drive pump
110L/min2.5bar
Compression EngineDuling,Italy
EvaporimeterWith DANFOSS/High pressure plate heat exchanger
Refrigeration AccessoryDanfoss / Emerson accessories (dry filters, oil separators, high and low pressure protectors, mirrors)
Expansion ValveDanfoss thermal expansion valve+Emerson electronic expansion valve
Operation PanelLNEYA custom 7-inch color touch screen, temperature curve display\ EXCEL data export
Safe GuardingWith self-diagnosis function; phase sequence phase breaker, freezer overload protection; high-voltage pressure switch, overload relay, thermal protection device and other safety protection functions.
CryogenR404A R23 / R14 mixed refrigerant
Interface sizeG1
External dimension (water cooling)100*150*185
Water-cooled WType W is water cooled
Water-cooled CondenserCasing heat exchanger (Paris / Shen’s)
Cooling Water At 20 ℃4500L/H
1.5bar~4bar
Source 380V50HZ37kW max
SourceAC 380V 50HZ Three-phase five-wire system
Customizable 460V 60HZ、220V 60HZ Three-phase
Shell MaterialCold rolled sheet spray (Standard Colour 7035)
Isolation Explosion ProofCustomizable isolation explosion-proof(EXdIIBT4)
LNEYA Explosive proof product installation license number:PCEC-2017-B025
Barotropic Explosion ProtectionCustomizable barotropic explosion-proof (EXPXdmbIICT4) barotropic systems must be water-cooled equipment;
LNEYA Explosive product installation license number: PCEC-2017-B025

About Us

LNEYA attends various exhibitions at home and abroad every year. At the exhibition, we show the latest research equipment of LNEYA. Every year, long-term cooperative customers will come to exhibitions and communicate with us. We are also actively developing new customers to provide them with high quality machines and services.

After sale service

Quality assurance

Guarantee that the goods are sold to be conform to the provisions of the contract and qualified new products by factory inspection, quality performance, technical indicators and configured are in accordance with manufactures and technical documents stipulated in the contract.

Installation and debugging

After the arrival of the goods, my company or my company agent is responsible for installation and debugging of equipment need on-site installation and debugging.

Inspection and acceptance

After installation and debugging, acceptance by the customer to confirm the goods to be conform to the provisions of the contract and qualified new products, quality performance, technical indicators and configured are in accordance with manufactures and technical documents stipulated in the contract, and after the confirmation of a full set of technical documents, sign the installation acceptance report and confirm acceptance.

Training

At the same time of installation and debugging of equipment, my company’s after-sales service engineer is responsible for technical training for user until user can be skilled of operation. In the process of using equipment by customer, customer can consult relevant technical issues to after-sales service personal of our company at any time, according to the situation, my company will arrange training on site or remote.

After sale service commitment

A full free one year warranty since the date of acceptance, during the warranty period, all repairs and spare parts are free of charge(instrukent malfunction caused bu human factors will be charged of cost price of spare parts); After the warranty period, we will be responsible for maintenance of equipment for lifetime, according to the actual maintenance fees, appropriate fee will be charged.

(PS:There will have extra charge if the customer need on-site service. And customers need to describe the issue first and then send some failed pics or videos in advance, then Lneya judge if it is possible to go for after-Sales on site. )

购物车

X

我的足迹

X
keywords:< a href="https://lneya-online.com/sitemap.html" title="water chiller"target="_blank">Bottled joy < a href="https://lneya-online.com/sitemap.xml" title="water chiller"target="_blank">water chiller